EXPERIENCE
HVAC Lead Engineer _ Facilities Design Engineer
December 2010 – Present (3 years 11 months)Pfizer Manufacturing Puurs
Responsible for utilities in three new plants at the Pfizer Manufacturing Puurs from concept up to start up of the installation.
Integration of washing and filling line with HVAC installations.
* HVAC installation
* black piping
* clean room coördination
* LAF RABS design
* Isolator installation.
* Commisioning and start up ( VTP , VTR, PQ )
* Validation of the installation ( ESD, Design review , VQS, VPP )
HVAC Lead Engineer _ Facilities Design Engineer
2Consult bvba Studiebureau technieken
1999 – Present (15 years)
ventilation design clean rooms
technical audit buildings
energy audit
Owner
2009 – 2010 (1 year)
Pfizer Manufacturing Puurs
Lead in the HVAC design up to construction design for grade A , B and C rooms. The scope is ventilation, LAF units and black piping.
GSK Rixensart
I’ ve joined the HVAC team during basic design and coöperated to go from basic design right into 3D fabrication drawings as the goal was to make a short track installation. This meant constant review on site for coördination with other disciplines, and a severe presence on site. We finalised the project after a thorough commissioning up to final signature of all IQ/OQ’s.
SENIOR HVAC ENGINEER
2002 – 2010 (8 years)
Basic and detailed design of pharmaceutical production facilities.
Senior HVAC Engineer
Project Manager Industrial Refrigeration
September 1991 – November 1998 (7 years 3 months)Project Manager Industrial Refrigeration
November 1990 – November 1991 (1 year 1 month)
POST graduate courses :
2010 – 2011
KVIV Antwerpen : energy in industry
postuniversitair, Energietechniek in gebouwen
Activities and Societies: Basisbegrippen, Bouwfysica en ventilatie, Verwarming en koeling, Verlichting, Energieprestatie en ontwerp
De URL controleren op typefouten of naar de startpagina van de site gaan